Add Exterior Corridor and Repair Hangar 603
Grand Forks AFB, ND
Project Date: 2011
This competitive bid project included full renovation to the existing Hangar 603 approximately 41,704 sf. This includes demo of the interior full finish area (5,835 sf) to accommodate the new floor plan for offices and restrooms, constructing an additional 1,110 sf to second floor, with structural steel and masonry walls. The entire building was upgraded: including the existing wet fire sprinkler system through-out the entire building along with the foam fire system in the hanger portion of the building; upgrading the existing HVAC and electrical through-out the entire building. Work also included an addition for the Exterior Corridor approximately 120 sf with 8' foundation walls with footers, and minor maintenance/repair of snow guards and exterior wall paneling damaged from snow.
Website: http://www.grandforks.af.mil/