Mid-Valley Storage
73 JW Drive
Carbondale, CO
Project Date: 2010
Competitive bid, new construction of 4,962 sf building, includes approximately 912 sf full finish office and 4,045 sf shop. The office area included a full bathroom with shower, breakroom with casework and sink and office/lab. The shop included five overhead doors, trench drains, radiant heat and motorized dampers. The building was constructed with a footer/stemwall foundation and concrete floor slab. The pre-engineered steel building was completed with R-50 metal building insulation in the roof and R-21 in the exterior walls over a full concrete subfloor with pilaster columns and grade beams. The exterior was finished with a brick wainscot and standing seam roofing with snow guards.
Carbondale, CO

Competitive bid, new construction of 4,962 sf building, includes approximately 912 sf full finish office and 4,045 sf shop. The office area included a full bathroom with shower, breakroom with casework and sink and office/lab. The shop included five overhead doors, trench drains, radiant heat and motorized dampers. The building was constructed with a footer/stemwall foundation and concrete floor slab. The pre-engineered steel building was completed with R-50 metal building insulation in the roof and R-21 in the exterior walls over a full concrete subfloor with pilaster columns and grade beams. The exterior was finished with a brick wainscot and standing seam roofing with snow guards.