UNDER CONSTRUCTION - Fruita Reed Park

ADDENDUMS 1, 2 AND 3 POSTED BELOW.  BID DATE HAS CHANGED.

Location:       
250 S. Elm St., Fruita CO
 
Accepting Proposals by Email:        No Later than 9:00 am on Friday 10/20/2023.
RFI’s by Email:         No Later than 9:00 am on Wednesday 10/11/2023.
 
Project Scope: This project consists of the removal and modification of existing concrete, asphalt and park facilities and the installation of new recreation & pedestrian improvements, utilities and pavement, a skate/wheel park and shelter/restroom facilities. Work includes, but is not limited to, installation and maintenance of traffic control and storm drain inlet protection, removal of existing asphalt, concrete, underground utilities, an existing restroom structure and existing landscaping and trees; procurement and installation of concrete drain pan, curb, gutter and sidewalk, concrete pavement, asphalt pavement, sewer, water, irrigation and drainage utilities, a stormwater pump system, rest room and shelter foundations and structures, playground facilities, wheel/skate park concrete and features, including related excavation, and trees/landscaping as shown on construction plans.
 
Bid Form:      Be sure to include cost breakdown of your proposal to the City’s format.  Reference the Bid Documents, Section 4. Special Provisions and Specifications (pages 7-19).
 
Project Schedule:
            Pre-Submittal Question Deadline:      10/11/2023 no later than 9:00am
            Deadline for Proposal Submittal:        10/20/2023 no later than 9:00am
            Anticipated Construction Duration:       6/15/2024 Final Completion
 
Please complete the lower portion of the ITB and email to us to let us know if you are bidding.  If you have any questions or comments, feel free to contact me.  Thank you.
Amanda Decker, (970) 245-9343